Robert Bird Group Office Fitout

Architecture Commercial Adelaide, South Australia, Australia

Media Contact

33 Images

Want to download these images?

Make sure you confirm usage rights with the BowerKit owner / contact person.

1.

3776 px 5520 px 10 MB A3 print

2.

5520 px 3610 px 10 MB A3 print

3.

5520 px 3659 px 9 MB A3 print

4.

5520 px 3684 px 12 MB A3 print

5.

5520 px 4057 px 10 MB A3 print

6.

5520 px 3637 px 11 MB A3 print

7.

3797 px 5520 px 9 MB A3 print

8.

5520 px 3305 px 10 MB A4 print

9.

5520 px 3709 px 11 MB A3 print

10.

5520 px 4672 px 13 MB A3 print

11.

5520 px 3684 px 12 MB A3 print

12.

4105 px 5520 px 10 MB A3 print

13.

3665 px 5520 px 13 MB A3 print

14.

5520 px 3684 px 9 MB A3 print

15.

5520 px 3329 px 9 MB A4 print

16.

5520 px 3534 px 13 MB A3 print

17.

5520 px 3169 px 11 MB A4 print

18.

5520 px 3489 px 9 MB A4 print

19.

5520 px 3568 px 14 MB A3 print

20.

5520 px 3543 px 10 MB A3 print

21.

5520 px 3565 px 10 MB A3 print

22.

5520 px 3684 px 10 MB A3 print

23.

5520 px 3684 px 13 MB A3 print

24.

5520 px 3684 px 13 MB A3 print

25.

3812 px 5520 px 9 MB A3 print

26.

5520 px 3615 px 13 MB A3 print

27.

5520 px 3582 px 13 MB A3 print

28.

5520 px 3684 px 13 MB A3 print

29.

5520 px 3543 px 11 MB A3 print

30.

3684 px 5520 px 9 MB A3 print

31.

5520 px 3225 px 11 MB A4 print

32.

5520 px 3619 px 14 MB A3 print

33.

5520 px 3633 px 11 MB A3 print

Description

The planning of the floor plate for Robert Bird Group was designed to cater for both SMEC and Robert Bird Group, who are independent companies (yet both members of the Surbana Jurong Group of Companies) and routinely collaborate on projects.

The planning allows some division between the groups yet encourages consistent collaboration by placing collaborative and multi-use zones centrally throughout the fitout.

A minimum requirement of approx. 25 workstations was exceeded, adding in an extra 9 for future growth. Both the budget and timeline of this project was tight from concept to completion with a budget of $550,000 over a 450m² office floorplate.

Questions and Answers

What were the key challenges?

450m² office floorplate from Concept to Completion on tight budget and an extremely tight timeframe.

What were the solutions?

A staged refurbishment fitout demonstrating a practical approach, taking advantage of an existing fitout and supplementing in the highest value areas to redefine visitor experience and increase staff collaboration.

How is the project unique?

The project had a very compressed timeframe, and Hames Sharley (HS) provided an innovative approach to the program. HS was able to design with sound basic design principles without requiring typical design periods to complete the schematic/ sketch design. The client had absolute faith that HS had reached the right design outcome in the sketch design period and engaged the contractor in sketch designs and the FFE schedules. HS was then engaged through the construction period to assist with on-site quires and undertake Contract Administration.

Details

Project size 450 m2
Completion date 2018

Project team

Louisa Glennon Interior Designer
Hames Sharley Initial Briefing (workplace strategy), Concept Design, Contract Administration.