Want to download these images?
Make sure you confirm usage rights with the BowerKit owner / contact person.
1. 3785 px 5678 px 12 MB A3 print |
|
2. 5760 px 3840 px 8 MB A3 print |
|
3. 5534 px 3689 px 13 MB A3 print |
|
4. 5716 px 3810 px 11 MB A3 print |
|
5. 6684 px 4456 px 15 MB A3 print |
|
6. 6679 px 4453 px 20 MB A3 print |
|
7. 6680 px 4453 px 13 MB A3 print |
|
8. 6693 px 4462 px 12 MB A3 print |
|
9. 4448 px 6672 px 15 MB A3 print |
|
10. 6701 px 4467 px 15 MB A3 print |
|
11. 4480 px 6720 px 16 MB A3 print |
|
12. 4403 px 6604 px 14 MB A3 print |
|
13. 3746 px 6192 px 9 MB A3 print |
|
14. 6656 px 4437 px 25 MB A3 print |
|
15. 4452 px 6678 px 14 MB A3 print |
|
16. 6562 px 4397 px 14 MB A3 print |
|
17. 4442 px 6663 px 13 MB A3 print |
|
18. 6328 px 4304 px 12 MB A3 print |
|
19. 6594 px 4396 px 13 MB A3 print |
|
20. 6696 px 4464 px 23 MB A3 print |
Data centres represent a very utilitarian aspect of the built environment, and yet they compose a particular kind of infrastructure within contemporary society, one where form must follow function.
Hames Sharley was selected as a partner, supporting NEXTDC in the successful delivery of Perth’s first Tier IV data centre (P2), just one of the new developments for the data centre operator across the country.
NEXTDC is Australia’s most trusted and highly interconnected platform of premium colocation data centres. Housing the country’s largest and most comprehensive ecosystem of >640 clouds, networks and specialist IT services providers.
Based in the Perth CBD, P2 forms an important digital interconnectivity hub, offering appropriate supporting infrastructure to deliver critical connectivity, front of house facilities, world-class security, a delivery area, storage and staging rooms and client parking and access. The newly built facility consists of over 10,000m² of technical space and 10 high density compute data halls.
Built to meet the increasing needs of today’s digital economy, the key moves and design principles consisted of:
• Integration with the existing site conditions and infrastructure
• Breakout spaces to the street for additional façade activation and improvement of the user experience
• Effectively connecting the street with the main building level being at the 1/100 year flood level (2.5m level difference)
• Concealment of services running externally
• Fast architecture – repeating fins to the street that creates a dynamic façade when moving past the building in a vehicle
• A lighting design to change the look of the building at night – proving 24-hour architecture for the Perth community.
Hames Sharley worked closely with Urbis and City of Perth (CoP) to deliver an outcome that worked for the local council and the client – balancing the security requirements with the City’s desire for an open and transparent public interface. As the architect and interior designer for P2 Perth, Hames Sharley also worked closely with subcontractors to deliver organised and considered services layout and routes, where possible.
The project provided several challenging scenarios, the greatest involving the need to deliver a non-public building with a public interface that also connected the street level.
Strong, bold architectural accents of red connect to emphasise 3D spatial geometries in NEXTDC, while spatial layering throughout controls lighting and sight-lines. Think refined industrial, exposed services and metallic finishes, which make up the overall design aesthetic.
Hames Sharley added further value by investigating and implementing, (within budget), the inclusion of breakout spaces to the street for additional façade activation and improved user experience.
The newly built facility is the pinnacle of data centre certifications worldwide. Tier IV infrastructure is a building block on top of the requirements for Tier III, adding complete fault tolerance to the infrastructure deployed on-site. Completely fault-tolerant infrastructure means that any individual equipment failures or distribution path interruptions that occur will have no impact on the overall operations of the facility.
The delivery method was Design and Construct, and Hames Sharley engaged early with the Head Contractor and sub-contractors on crucial design elements to ensure these critical elements were not overlooked, and the client achieved their optimal outcome.
With over 12,000m2 of technical data centre space at full fitout, P2 supports the highest-density, compute-intensive requirements for Perth organisations, and can scale from rack-ready cabinets to full contiguous rows and custom cages and private suites.
NEXTDC currently operates nine data centres nationwide, with facilities in Perth, Melbourne, Sydney, Brisbane, and Canberra.
Project size | 31000 m2 |
Completion date | 2020 |
![]() |
Amy Sala Tenna | |
Urbis | ||
![]() |
Hames Sharley | Master Planning, Architecture, Interior Design |