Want to download these images?
Make sure you confirm usage rights with the BowerKit owner / contact person.
1. EM Quartier Main Building with Tropical Water Garden 2560 px 3840 px 3 MB A4 print |
|
2. EM Quartier Main Building 4858 px 4858 px 7 MB A4 print |
|
3. EM Quartier Main Building with Tropical Water Garden 3654 px 2824 px 5 MB A4 print |
|
4. EM Quartier Main Building 1000 px 668 px 299 KB Print - Low res only |
|
5. EM Quartier Main Building 2026 px 3164 px 6 MB Print - Low res only |
|
6. EM Quartier Helical Atrium 1333 px 2000 px 1 MB Print - Low res only |
|
7. EM Quartier Tropical Water Garden on Floor 5 2850 px 2400 px 7 MB Print - Low res only |
|
8. EM Quartier Helical Atrium 1600 px 1068 px 1 MB Print - Low res only |
|
9. EM Quartier Helical Atrium 6796 px 5100 px 21 MB A3 print |
|
10. EM Quartier Tropical Water Garden on Floor 5 1066 px 1600 px 1 MB Print - Low res only |
|
11. EM Quartier Video Column 1200 px 798 px 978 KB Print - Low res only |
|
12. EM Quartier Lower Atrium 1801 px 2675 px 2 MB Print - Low res only |
|
13. EM Quartier Helical Atrium 1600 px 1068 px 1 MB Print - Low res only |
|
14. EM Quartier Tropical Water Garden on Floor 5 903 px 1355 px 1 MB Print - Low res only |
|
15. EM Quartier Helical Atrium 1417 px 795 px 1 MB Print - Low res only |
|
16. EM Quartier Tropical Water Garden on Floor 5 4000 px 2667 px 6 MB A4 print |
|
17. EM Quartier Tropical Water Garden on Floor 5 1920 px 1280 px 1 MB Print - Low res only |
|
18. EM Quartier Tropical Water Garden on Floor 5 1920 px 1280 px 1 MB Print - Low res only |
|
19. EM Quartier Tropical Water Garden on Floor 5 1600 px 1059 px 2 MB Print - Low res only |
|
20. EM Quartier Main Building with Video Projections 5583 px 6975 px 19 MB A3 print |
|
21. EM Quartier Helical Atrium 6796 px 5100 px 21 MB A3 print |
|
22. EM Quartier Helical Atrium 6796 px 5100 px 20 MB A3 print |
These videos are available for media use.
EM Quartier - one of the most anticipated retail centers in South East Asia was designed by LEESER Architecture for The Mall Group, EM Quartier is the second project in a cluster of shopping malls collectively known as the District EM, which also includes the recently renovated Emporium and future project EM Sphere. The 3 million square foot, $800 million mixed use center is a world class destination for shopping, dining, and entertainment.
Working with the developer responsible for the largest shopping center in South East Asia, LEESER Architecture has created a design that evokes the synthesis of beauty and unpredictability found in both nature and urbanism. The building completely reinvents the conventional layered structure of more normative shopping centers by introducing a helical floor that allows visitors to completely avoid using escalators by slowly ascending along the 50 or for and restaurant locations located in the upper section of the center. A major tropical water garden without any commercial activities and beautiful views across the city of Bangkok separates the main shopping sector from the food area above. The buildings floor plates are shifted so they do not align with the floors above providing outdoor terraces for the visitors, blurring the boundary between inside and out. The design furthers the notion of openness through the incorporation of an ample amount of glass between the soft curves of the buildings.
EM Quartier is centered on the Bangkok Sky Train and comprised of retail and entertainment venues as well as an abundance of green space. Key features include six stories of dining terraces atop the helical floor slab, an eight theater cinema complex including one Imax Theater, pedestrian streets, floating gardens and a five-story waterfall, as well as one of the worlds largest automated robotic underground parking structure.
What was the brief?
To design a world class cutting edge shopping, culture and entertainment center
What were the key challenges?
Zoning as well as a previous design by a local architect was eventually abandoned by the client that left us with a structural design system we had to adhere to to a relatively large extend. Zoning information changed during the design process which forced readjusting the design midway through the process.
What were the solutions?
To be inventive and flexible, working hard to modify the design without loosing its concept.
Completion date | 2015 |
Building levels | 11 |
![]() |
Leeser Architecture New York | Design und coordination with all consultants |
![]() |
DBALP, Duangrit Bunnag Architect Limited | Construction Documents and Administration Building 1 |
Design 103 International Ltd., Bangkok | Construction Documents and Administration Building 2 |