Want to download these images?
Make sure you confirm usage rights with the BowerKit owner / contact person.
1. 1500 px 1000 px 372 KB Print - Low res only |
|
2. 1000 px 1500 px 430 KB Print - Low res only |
|
3. 1500 px 1000 px 602 KB Print - Low res only |
|
4. 1500 px 1000 px 511 KB Print - Low res only |
|
5. 6000 px 3750 px 17 MB A3 print |
|
6. 4500 px 6000 px 16 MB A3 print |
|
7. 1500 px 1000 px 386 KB Print - Low res only |
|
8. 6000 px 4500 px 14 MB A3 print |
|
9. 1500 px 1000 px 361 KB Print - Low res only |
|
10. 1500 px 1000 px 243 KB Print - Low res only |
|
11. 6000 px 3375 px 8 MB A4 print |
|
12. Andrew Latreille 6000 px 4500 px 16 MB A3 print |
|
13. 1500 px 1000 px 231 KB Print - Low res only |
|
14. 1500 px 1000 px 347 KB Print - Low res only |
This project includes master-planning for a combined elementary and middle school campus, considering the immediate, medium, and long-term vision for the institution. The expansion seeks to seamlessly integrate with the existing tilt-up concrete building while creating new and unique outdoor learning and play spaces.
The immediate vision involves designing a classroom and multipurpose space to fill a range of needs from the Ministry of Education, while allowing for modest future growth with an addition to the existing elementary building. The design challenge required careful siting to ensure that both the existing interior and exterior were enhanced by the addition, with consideration for vehicular and pedestrian movement, sunlight, and airflow.
The addition links into the current structure at its southeast corner, creating a “quad” with easy access to the schoolyard. A generous single-loaded corridor with glazing to the west allows for the classrooms to get natural light from two sides. The colourful graphics lining this light-filled space are inspired by the mountain views of Golden Ears visible from the upper floors of the building.
Expansive playing fields, outdoor classrooms, and gardens provide learning opportunities throughout the site. This area will be shared with a future middle school that will bookend the site with a new road connection through to the high school, located just a few blocks to the west.
Project size | 1812 m2 |
Completion date | 2023 |
Building levels | 2 |
![]() |
MOTIV Architects |