SCARBORO BEACH SERVICES & SURF CLUB

Architecture Commercial Perth, Western Australia, Australia

Media Contact

15 Images

Want to download these images?

Make sure you confirm usage rights with the BowerKit owner / contact person.

1.

2500 px 1667 px 2 MB Print - Low res only

2.

2500 px 1667 px 2 MB Print - Low res only

3.

2500 px 1667 px 3 MB Print - Low res only

4.

2500 px 1667 px 2 MB Print - Low res only

5.

2500 px 1667 px 3 MB Print - Low res only

6.

2500 px 1667 px 2 MB Print - Low res only

7.

2500 px 1666 px 2 MB Print - Low res only

8.

2500 px 1667 px 2 MB Print - Low res only

9.

2500 px 1667 px 3 MB Print - Low res only

10.

2500 px 1667 px 3 MB Print - Low res only

11.

2500 px 1667 px 2 MB Print - Low res only

12.

2500 px 1667 px 2 MB Print - Low res only

13.

2500 px 1667 px 3 MB Print - Low res only

14.

2500 px 1667 px 3 MB Print - Low res only

15.

2500 px 1667 px 3 MB Print - Low res only

Description

Surf clubs provide wonderful community and cultural benefits. By their very nature they exemplify what it means to be Australian.

The principles of the Scarborough Surf Saving Club emanated from our collaboration with the foreshore redevelopment team. This was evident from the project’s inception and briefing workshops which enabled us to fully understand the wants and needs of all key stakeholders.

Questions and Answers

What are the sustainability features?

Many sustainability initiatives were investigated as part of this project, including solar panels, grey water re-use and meter monitoring. The most effective measures integrated were passive solutions to minimise energy usage, including fully opening windows and minimising direct sunlight.

What are the key moves and design principles?

Our approach centred on the often quoted ‘sand and sea’ that describes the coastal location. The design of upper building consists of two forms; sand – inspiring the ‘solid’ form that houses the functional service parts of the precinct and sea – inspiring ‘transparent’ forms that represent sea froth, realised as permeable enclosures.

Transparency is enhanced with concrete fins inspired by surfboards and waves to create a rhythm to the exposed south of the building. These fins aren’t just architectural expressions but also enable lines of sight from the entry through to the ocean, whilst providing structure and thermal mass for ESD compliance. The lower facilities are finished with concrete and timber cladding, creating legibility and a sense of tranquillity.
The wall that connects the existing limestone turret, the boatshed and the tower’s southern elevation are finished in limestone, thereby connecting the new development to the old.

What was the brief?

The objectives and design principles for the Scarborough Surf Saving Club were identified during early workshops and included building on Scarborough’s identity, creating an activated, integrated and attractive place and defining “what is the role of the Beach services and the SLSC”.

From the outset Hames Sharley approached the project as an exercise in urban design. Issues including activation, view corridors, integration and micro-climate
were all analysed with stakeholders before the building forms were developed. Once these issues were understood the team considered the project as a series of spaces, positioned to enhance and celebrate the overall precinct. The external spaces created
being as important as the internal spaces.

One of the first decisions by the design team was to split the operational areas on the lower level with the hospitality and managerial areas on the upper promenade. Splitting these spaces is the lower promenade public pathway, allowing the public pass through the surf club zone.

Who are the clients and what's interesting about them?

The Metropolitan Redevelopment Authority are transforming Perth into a vibrant, connected city that can meet the needs of a growing population.

With a unique combination of powers, a thoughtful place making model and a passionate team, they are able to deliver complex and strategically significant projects where other approaches have been unsuccessful. Their approach to delivering challenging projects is centred on a vision to create dynamic, authentic and sustainable places with communities where people want to live, work and visit.

Details

Project Budget USD 13,000,000

Project team

Derek Hays Design Architect
Gary Mackintosh Design Architect
Jessica Hames Design Architect
Philip Chun Building Surveyor
Wood & Grieve, Mechanical Engineer
Georgiou Group Builder
Arup Civil Consultant
Hames Sharley